Solar Panel Clamps Manufacturers
Your Solar Panel Mounting Clamps Manufacturer Expert
- As factory in China, Xiamen PV Mounts offer comprehensive solution for your solar mounting with solar panel clamps
- 10 Years Experience for Solar Mounting System and Components
- AS/NZS 1170.2-2002, JISC8955:2017, Euro Code 8, DIN 1055, IBC 2009, MCS012, UL2703, SGS etc. Certificated
- Each Components as well as full solar mounts system guarantee 25-year-lifespan of 25 and 10-year-warranty for business.
- We make strict Q/C inspections for every process of the production from raw materials, anodizing, cutting , module etc.

What types we can offer
Solar panel clamps are meticulously designed to endure weather extremes and mechanical strains, ensuring a secure, long-lasting installation.
While the basic function remains the same, the types of solar panel clamps vary greatly.


Lightweight with anodized aluminum for the anti-corrosion ability for a long and durable life. End clamps are designed to secure the edges of solar panels to the mounting rails.

Made from high-strength materials like aluminum or stainless steel, these clamps latch onto the seam of the roof, providing a stable and durable attachment point for various applications.
Application of Solar Panel Clamps

Metal Roof Solar Mounting System

Tile Roof Solar Mounting System

Flat Roof Solar Panel Mounting

Carport Solar Mount System

Ground Solar Mount Systems
Certificates & Test
What obtained different kind of clamps and solar mount components certificates for various markets.
- AS/NZS 1170.2-2002: Australian and New Zealand standard focusing on the structural design of buildings to withstand wind actions. conditions.
- JISC8955:2017: Japanese standard for solar mounting systems’ safety requirements and testing methods. It assures the structural integrity and durability.
- Euro Code 8: This European standard provides guidelines for earthquake-resistant design of structures.
- DIN 1055: A German standard that covers the structural design of buildings and building works, including load assumptions.
- IBC 2009: The International Building Code (2009 version) sets forth various standards for the construction of buildings, including those for solar panel mounts.
- MCS012: A UK-based Microgeneration Certification Scheme standard specifically for fixing systems used with solar panels.
- UL2703: A U.S.-based standard that covers rack mounting systems, mounting grounding systems, and clamping devices for flat-plate photovoltaic modules and panels.
- SGS: Although not a standard, SGS is a testing and certification company that can validate solar mounting systems against various national and international standards.

Manufacturing Details of Solar Panel Mounting Clamps

Raw Aluminum Pods
جراب ألومنيوم ممتاز الأداء لكل جهاز يعمل بشكل مثالي

خطوط البثق
Several production lines to ensure the product lead time

القطع
Accurate cutting process to ensure max aluminum utilization

الطلاء بأكسيد الألومنيوم
Process to improve corrosion resistance and coating finishes.

الفحص
Inspection for drawing, size, thickness, hardness, quantities etc.

التجميع المسبق
Necessary pre-assembling for your easy installation in projects

التعبئة والتغليف
Each clamps packed in boxes and cartons

التحميل
التحميل إلى الحاوية مع اتخاذ تدابير وقائية لضمان حسن استقبال العميل.
Projects of Solar Panel Mounting with clamps

أرمينيا
Adjustable Tilted Panel Systems with clamps, rails and solar panels - 50KW

نيوزيلندا
Adjustable Tilt Solar Panel Mounting System with aluminum & stainless steel clamps - 230KW

جمهورية سلوفاكيا
Tile Roof System with solar panels, rackings and clamps hardware - 100KW

ناميبيا
Metal Roof Mounting System with solar clamps and other components - 150KW
الأسئلة الشائعة
A: We are factory with more than 120+ professional machines and workers. Also full set of certificates.
ج: يرجى تقديم هذه التفاصيل قدر الإمكان. شكراً.
1 | بُعد اللوح الشمسي: | _________(Length*Width*Thickness) |
2 | كم عدد الألواح الشمسية التي تخطط لتركيبها للمشروع؟ | ______ |
3 | تصميم مصفوفة الألواح الشمسية. إذا لم يكن متاحاً، يُرجى إرسال حجم (طول وعرض) موقع التركيب الخاص بك. | |
4 | ما هي زاوية الميل البصري للألواح الشمسية؟ | _______دريج. |
5 | ما هي سرعة الرياح وحمولة الثلوج؟ | ___م/ثانية سرعة الرياح و____ كيلو نيوتن/م2 حمولة الثلج. |
6 | ما هو اتجاه تركيب الألواح الشمسية؟ | _______ (أفقيًا أو رأسيًا). |
7 | خطوط الطول والعرض لموقع التركيب؟ | |
8 | ما هو الأساس الذي تحتاجه لنظام التركيب الأرضي القادم؟ | ______( المسمار الأرضي/الخرسانة/الخرسانة/الركيزة/العمود) |
9 | ما هو أدنى ارتفاع من اللوح الشمسي إلى الأرض؟ | _______mm |
A: We offer free Solar clamps sample for our customers to check the product. The shipping fee is on your side. And the fee will be refund in your first order.
ج: يعتمد ذلك على كمية طلبك ومتطلباتك. حوالي 7 إلى 15 يوم عمل بمجرد استلام الإيداع.
الكمية (قطع) | 1 – 500 | 501 – 5000 | 5001 – 50000 | > 50000 |
المهلة الزمنية (بالأيام) | 7 | 10 | 15 | يتم التفاوض بشأنها |
مدة السداد | T/T | طلبية صغيرة | 100% T/T مقدمًا |
إكسو | |||
DAP | |||
فوب | 30% T/T مقدما، 70% الرصيد المدفوع قبل الشحن. | ||
CNF | 30% T/T مقدمًا، الرصيد المدفوع مقابل نسخة من B/L | ||
CIF | |||
طريقة التسليم | عن طريق البريد السريع، عن طريق الجو، عن طريق البحر أو القطار |
ج: نقدم ضماناً لمدة 10 سنوات وعمر افتراضي يصل إلى 25 عاماً.
A: OEM/ODM orders are welcomed with your design and logo printed. If any other requirement details, let’s talk!
احصل على عرض أسعار
كيف يمكننا المساعدة
Xiamen PV Mounts are happy to offer the professional solutions for your solar mounting business with our experienced and skilled team.
- زيارات المصانع
- عرض أسعار مفصل بالكامل
- فحص الجودة/التفتيش
- مهلة زمنية قصيرة
- استشارة التركيب مجاناً
- رسم تصميم مجاني
- قائمة بوم بوم المجانية
- عينة مجانية